The following fees and charges shall be set from time to time: wastewater disposal system connection charge, construction inspection charge and plan review charge. (Comp. Ords. 1987, § 25.080)

If damage over and above the amount of the liability insurance required by section 70-372 is committed upon the village utilities, including but not limited to the existing sewer line, then in that event the contractor and the person whose name appears on the installation permit shall be jointly and severally liable for such damage. (Comp. Ords. 1987, § 25.305)

The minimum specifications for pipes and joints which shall be acceptable for new sanitary sewer installation shall be as established by the village. (Comp. Ords. 1987, § 25.306)

Installation of a new sanitary sewer system shall be completed within 30 days from the date of the issuance of the installation permit. (Comp. Ords. 1987, § 25.308)

Final inspection and approval of the sewer hook-up shall be made by the department of public works superintendent or his designated representative prior to the covering up of the newly installed sewer pipe. Inspections shall be made on weekdays, Monday through Friday, between the hours of 8:00 a.m. and 5:00 p.m. (Comp. Ords. 1987, § 25.309) Secs. 70-378—70-400. - Reserved.